Under PM Surya Ghar: Muft Bijli Yojana, eligible residential households receive a direct central government subsidy of ₹30,000 for 1 kW, ₹60,000 for 2 kW, and capped at ₹78,000 for 3 kW and above. The subsidy is credited straight to your bank account through Direct Benefit Transfer (DBT) after successful DISCOM inspection and net-meter commissioning. Installations must be executed through MNRE-empanelled vendors like PRASOL ENERGY using eligible ALMM-listed solar panels.
How PRASOL ENERGY Helps
PRASOL ENERGY provides an end-to-end solar assistance process for eligible residential customers. Our approach is designed to reduce avoidable errors before installation and help customers coordinate the application, technical and post-installation stages.
- Document verification before application: we can review your Aadhaar, electricity bill and bank linkage before you submit the application, helping identify common mismatches early.
- Portal submission and tracking: our team can assist with the portal journey, from application and feasibility through commissioning documentation and status tracking.
- Eligible solar components: we work with established manufacturers and suitable products for the project, subject to applicable scheme and DISCOM requirements. ALMM eligibility should be verified for the exact module model before installation.
- Post-installation subsidy follow-up: we assist customers in tracking the applicable DBT process and coordinating with the concerned DISCOM/vendor when clarification is required.
- Residential Solar: rooftop systems can be designed according to sanctioned load, consumption, roof area and applicable scheme requirements.
- Solar consultation: our team can help estimate system size, likely generation, project cost and applicable subsidy before installation.
- Customer support: speak with our team for site survey, documentation, solar sizing and project assistance.
What Is PM Suryaghar: Muft Bijli Yojana?
PM Suryaghar: Muft Bijli Yojana is a pioneering Government of India rooftop-solar initiative administered nationwide in collaboration with regional DISCOMs (such as TPSODL in Berhampur and Southern Odisha). It provides residential homeowners with direct capital subsidies credited straight to their bank accounts via DBT after technical verification and net-meter inspection.
- Reduce household electricity bills through rooftop solar generation.
- Increase residential rooftop-solar adoption.
- Support cleaner electricity generation at homes.
What is covered: grid-connected rooftop solar for eligible residential consumers under the scheme. Commercial/industrial consumers are outside this specific residential subsidy framework.
PM Suryaghar Subsidy Amounts
The supplied reference also notes that some states may provide additional state-level support. Any Odisha-specific top-up should be checked against the latest Odisha Government/DISCOM notification before being advertised as guaranteed.
Benchmark Cost Reference
| System Size | MNRE Benchmark Cost | Central Subsidy | Net Cost at Benchmark |
|---|---|---|---|
| 1 kW | ₹75,000 | ₹30,000 | ₹45,000 |
| 2 kW | ₹1,50,000 | ₹60,000 | ₹90,000 |
| 3 kW | ₹1,95,000 | ₹78,000 | ₹1,17,000 |
| 5 kW | ₹3,00,000 | ₹78,000 | ₹2,22,000 |
| 10 kW | ₹5,40,000 | ₹78,000 | ₹4,62,000 |
Who Is Eligible?
✓ You may qualify if
- You own a residential property in India.
- You have an active eligible residential electricity connection.
- Your connection is in the domestic/LT-residential category.
- You have suitable shadow-free rooftop space.
- You have not already received a central rooftop-solar subsidy at the same premises.
- Your bank account is appropriately linked for DBT.
✕ Generally not eligible under this residential framework
- Commercial or industrial premises.
- Premises where the applicable central subsidy has already been availed.
- Tenant applications without required owner consent/NOC.
- Off-grid systems under this specific residential rooftop subsidy.
The exact eligibility and documentation depend on the current scheme rules and participating DISCOM requirements.
How to Apply — Step by Step
Use the official PM Suryaghar portal, select your state and DISCOM, enter the electricity consumer details and complete OTP verification.
Select an eligible vendor available for your DISCOM area. Installation and commissioning documentation must follow the applicable portal and DISCOM process.
The DISCOM reviews technical feasibility and sanctioned load. Do not begin installation before the applicable feasibility/approval stage is completed.
The vendor installs the system and submits the required commissioning report, photographs and documents through the applicable portal.
After inspection and applicable net-metering/commissioning steps, the subsidy process proceeds toward DBT to the eligible linked bank account.
Documents Required
| Document | Purpose | Typical Source |
|---|---|---|
| Aadhaar card | Identity and DBT linkage | UIDAI / DigiLocker |
| Latest electricity bill | Consumer number and category proof | DISCOM / electricity app |
| Property ownership proof | Premises/ownership verification | Sale deed / property-tax record |
| Bank account details | DBT disbursement | Bank passbook / statement |
| Passport-size photograph | Application/registration requirement where applicable | Standard photograph |
| Mobile number registered with DISCOM | OTP verification | DISCOM records |
Name matching is critical. The supplied reference highlights Aadhaar/electricity-bill name mismatch as a common rejection or delay factor. Check the consumer details before applying.
PM Suryaghar Process Timeline
| Stage | Reference Timeframe | Possible Bottleneck |
|---|---|---|
| Portal registration → feasibility | 7–15 working days | DISCOM workload |
| Feasibility → installation | 7–14 days | Vendor schedule |
| Installation → DISCOM inspection | 5–10 working days | Inspector availability |
| Inspection → net meter | 7–15 days | DISCOM meter/process availability |
| Net meter → subsidy DBT | 30–45 days | Processing and verification |
| Total reference range | 60–90 days | Clean documentation can reduce delays |
These are reference timelines from the supplied material, not a guarantee. Actual processing depends on the DISCOM, documents, inspection, portal status and current government process.
Common Mistakes That Can Cause Rejection
- Using a non-empanelled installer. Verify the vendor's eligibility for your DISCOM before proceeding.
- Using non-ALMM panels where ALMM compliance is required. Ask for the exact module model and verify its current eligibility.
- Name mismatch between Aadhaar and electricity records.
- Entering the wrong consumer number. Use the consumer number shown on the electricity bill.
- Pending electricity dues. Clear applicable arrears before applying.
- Bank account not appropriately Aadhaar-seeded/linked for DBT.
- System capacity exceeding sanctioned load. A load-enhancement process may be required before proposing a higher capacity.
Addressing and avoiding these common documentation errors beforehand ensures seamless DBT subsidy approval without delay.
State-Level Differences
While the central PM Surya Ghar subsidy is uniform across India, state-level DISCOM workflows and potential state top-ups can vary. For Odisha (TPSODL, TPWODL, TPCODL, TPNODL), PRASOL ENERGY coordinates directly with your local utility for net-metering approvals.
| State in Reference | Key Difference Mentioned | Additional Support Mentioned |
|---|---|---|
| Gujarat | Four major DISCOMs are listed in the source | State/portal integration mentioned |
| Maharashtra | MSEDCL and inspection queues are highlighted | State top-up in select cases mentioned |
| Rajasthan | JVVNL/AVVNL/JdVVNL processes mentioned | State facilitation mentioned |
| MP | Three DISCOM zones are mentioned | State support for eligible BPL households mentioned |
How to Choose the Right System Size
You can quickly estimate the right rooftop solar system capacity using this standard formula:
Required Solar Capacity (kW) = Monthly Electricity Consumption (kWh) ÷ 120 units
Example: If your average monthly bill shows 360 units consumed, you require approximately a 3 kW solar rooftop system (360 ÷ 120 = 3 kW).
| Approx. Monthly Bill | Approx. Consumption | Reference System Range | Expected Generation |
|---|---|---|---|
| ₹1,000–₹2,000 | 100–200 kWh | 1–2 kW | 120–240 kWh/month |
| ₹2,000–₹4,000 | 200–400 kWh | 2–3 kW | 240–360 kWh/month |
| ₹4,000–₹7,000 | 400–700 kWh | 3–5 kW | 360–600 kWh/month |
| ₹7,000+ | 700+ kWh | 5–10 kW | 600–1,200 kWh/month |
Final system sizing should be based on actual consumption, sanctioned load, roof area, shadow conditions, local solar resource and the applicable DISCOM rules. Do not size a system solely to maximise subsidy.
Frequently Asked Questions
What is the maximum central subsidy under PM Suryaghar?
The maximum central government subsidy is ₹78,000 for residential rooftop solar systems of 3 kW capacity and above.
Can a tenant apply for the subsidy?
A tenant may apply if the property owner provides the required NOC/consent, and the electricity meter connection and Aadhaar-seeded DBT bank requirements are met. Exact DISCOM guidelines should be verified before applying.
How long does the subsidy take to arrive?
The DBT subsidy is typically credited within 30–45 days after DISCOM inspection and bi-directional net-meter installation, though timelines may vary slightly based on local DISCOM verification queues.
Can I apply without an empanelled vendor?
No. Scheme guidelines mandate that the rooftop solar installation and commissioning must be carried out through an officially empanelled MNRE vendor such as PRASOL ENERGY.
What if my application is rejected?
You can check the specific rejection remark on the national rooftop solar portal, rectify the discrepancy (such as name mismatch, incorrect consumer number, or unseeded bank account), and resubmit. Our team can guide you through the rectification.
Is PM Suryaghar available for apartments or housing societies?
Yes, the scheme includes provisions for individual apartments as well as common area lighting and electric loads for Group Housing Societies (GHS) and Resident Welfare Associations (RWA).
Can an existing solar installation receive the subsidy?
Only new grid-connected rooftop systems installed through registered empanelled vendors using ALMM-approved panels and following the formal portal sanction process qualify for the DBT subsidy.
What is the difference between PM Suryaghar and PM-KUSUM?
PM Suryaghar is focused on residential rooftop solar, while PM-KUSUM is a different MNRE programme focused on agricultural/farmer-related solar applications such as solar pumps and plants. The eligibility, process and benefits are different.
Ready to Explore Rooftop Solar?
PRASOL ENERGY can assist with preliminary document checking, site survey, system sizing, product selection, installation coordination and applicable PM Suryaghar process support.
Contact PRASOL ENERGY View Solar Gallery